Background. 150-Ton Slab Haulers working 24 hours a day, 7 days a week had major ongoing problems with dust, rough potholed roads, and high equipment maintenance and labor costs. Haul roads were being graded every day and water was applied continuously.
Sustaining Road Surfaces Without Causing Environmental Risk
Background. A Canadian concrete drainage products manufacturer and distributor in Canada had been using oil and asphalt grindings to control fugitive dust on its main in-plant roadways and loading areas.